Our office is located on the 3rd floor of the stylish HTC Keilaniemi Waterfront office building with a spectacular sea view. We are located along excellent transport connection. We are easy to reach by bus, car and metro.
The 60-year-old caisson-type quay structure at Pori’s Tahkoluoto oil harbour will be demolished and a new retaining quay wall will be constructed in its place. At the same time, the […]
The contract concerns the construction of approximately 500 metres of retaining wall quay at the D0 and D2-3 quay berths in the D section of Mussalo Harbour. The project includes […]
Boskalis has received a Letter of Confirmation of Acceptance of Bid for the Land Development Design and Construction of the Manila International Airport (MIA) in the Philippines. The Letter of […]
The most important prize in the Swedish public construction sector, Årets Bygge 2021 (Construction of the year 2021) was awarded on Thursday 18th March by the construction sector magazine, Byggindustrin, […]
With a length of 400 metres and a width of nearly 60 metres, this giant ship had been wedged in this vital shipping route since 23 March 2021, blocking all […]
The quay to be constructed is an anchored combi-wall structure. The contract includes driving of tubular steel piles and sheet piles, anchoring, coping beam and backfilling works, structural layers and […]